Saturday, January 29, 2011

Foundation In and Walls Going Up

The footing has been poured and five levels of Faswall have been installed. That includes the stem wall and the first 16 inches of the house walls. Conduit is in place for electrical wiring and outlets and we are waiting for the first concrete infill of the Faswall blocks. The contractor, SAR Construction, has done a very neat and careful job so far, and each row of Faswall is straight and level. They have taken care to ensure straight and even walls, including fastening plywood to the Faswall at each corner for extra support during the concrete infill.


Rebar in place