Saturday, May 21, 2011

Paint Is On the Inside Walls

It's coming together!  The house inside walls are now painted. Next step is the electrical trim (putting in the switches, outlets, coverplates, etc.) and installing the cabinets. The garage/shop has been wired and next step there is to insulate the shop area.


The Accent Wall in Living Room

Kitchen Area

The Garage/Shop Getting Ready for Stucco

Sunday, May 8, 2011

Drywalled!

The ceiling and walls all have drywall now. The drywall crew came through and put the wallboard up in two days. It was quite something to watch them whiz through the rooms, wasting no time and being very efficient of their movements, as if it were choreographed. Next will be taping, then painting.

The garage trusses are mostly on, and plywood is on the exterior walls.

Putting the Trusses on the Garage/Shop

Drywall In Progress


Messy Process!